To run the test: opkg install gpsd-test_1.0-*_all.ipk /etc/rc5.d/S99zzreboot To shutoff the test: rm /var/config/reboot To restart the test: touch /var/config/reboot /etc/rc5.d/S99zzreboot A log of successful tests is kept in: /var/config/gpslog.txt. It contains the seconds since 1-1-1970, baud rate, and the ntpq -p output for the PPS. On failure, the test will stop rebooting. Failure is defined as: No fix (if we lost reception this could happen) Bad baud rate (not 115200)